/
Print
Services
Residents
Business
Visitors
Government
City of Knoxville
Blogs
City Blog
New 900-Square-Foot Impound ...
New 900-Square-Foot Impound Building Offers Small Comforts for Employees, Improved Customer Service
Today (Friday, Nov. 20), Mayor Indya Kincannon toured the City’s new Impound Building, 3407 Vice Mayor Jack Sharp Road, and talked with the Fleet Services Department employees who staff impound operations.
Mayor Indya Kincannon (center) talks with (from left) Fleet Services' Shane Walters, Nicholas Bradshaw, Keri Collins and Donisha Russell.
The new building is just 900 square feet. But for the 10 City Fleet Services employees who staff the Impound Lot 24/7, the small building is a big deal.
The old building, which will be razed next year, was an extension of a concession stand from a 1990s BMX track. It was literally falling apart.
“It had gotten untenable,” says Fleet Services Director Nicholas Bradshaw. “Formerly being a concession stand, there was no interior access from the office to the restroom – employees and customers had to go outside to enter the restroom.
“Even worse, there had been some settling over the years, so the floor was sloping. There were cracks in the walls, and the roof leaked. It had gotten so bad, the doors wouldn’t shut.”
There are even spaces where daylight was visible through gaps in the block walls.
Bradshaw says the new building offers better customer service.
For example, there are now automated gate controls that all employees can access. Before, if an employee was helping a customer, he or she would have to stop and deal with opening the gate if a tow truck arrived and needed access to the impound lot.
In the old building, there wasn’t even heating or air-conditioning in the customer vestibule. In the new climate-controlled building, visitors won’t be cold in the winter or hot in the summer.
“The new building is not plush by any means,” Bradshaw says. “But it’s a huge difference for the employees who had been working in an uncomfortable office setting, or for customers with business needs.”
Here are a few photos of the vestibule and front counter of the new building, and below that are photos of the old and the new buildings.
Old versus new:
Posted by
evreeland
On 20 November, 2020 at 3:44 PM
Recent Posts
Nimble City Crew Fixes 1,000 Potholes in 3 Months
Mayor Kincannon: Key Riverwalk Connection is 'Critically Important'
Wide, Tree-lined Sidewalks Will Connect to Stadium - and So Will Future Greenways
Stadium Update: Concrete Poured for Plazas, First Trees Planted, Streetscapes Improvements Under Way
Crime in Knoxville is Down - and 2/3 of Residents in East Knoxville TLC Zone See Positive Change
Work Begins on Sevier Avenue Streetscapes; Look for Regularly Scheduled Project Updates
Postcard Photo of Augusta Quarry in Snow: Check Out the 9 New Swim Platforms!
Revolutionary War Veteran Honored With Victor Ashe Park Gravesite Restoration
Smokies Baseball and One Knox Soccer: Careful Collaboration Makes for 'A Great Fit'
12 Days of Public Service
Archives
March 2025 (2)
February 2025 (2)
January 2025 (5)
December 2024 (5)
November 2024 (1)
October 2024 (5)
September 2024 (1)
August 2024 (2)
July 2024 (2)
June 2024 (1)
May 2024 (1)
Group Blogs
City Blog
KAT Blog
KPD News & Alerts
Magnolia Avenue Streetscapes Project
More...
Post Categories
City Events
City Services
Cumberland Ave.
Downtown
Government
KAT
Mayor Kincannon
Meetings
Neighborhoods
Outdoor & Recreation
Public Safety
Redevelopment
Road Work
South Waterfront
Sustainability
Content Alert Subscription
Blog Feeds
Podcast Feeds
Subscribe to Email Alerts