All lanes of traffic will remain open on a section of Neyland Drive (near Leinard Lane).
However, motorists traveling east and westbound in this area are advised to expect possible temporary delays from 7 a.m. to noon on Friday, September 14, as heavy trucks and equipment enter and exit a construction site at the south side of KUB's Kuwahee Wastewater Treatment Plant.
Some listed closures may extend beyond the scheduled times, depending on the conditions encountered during excavation and construction. Appropriate traffic control measures will be in place at each location to assist motorists traveling in these areas. Due to the ongoing presence of workers and equipment, motorists are advised to use extreme caution and expect temporary delays in these areas.